BASIC ESTIMATING 
Carry Out Measurements and Calculations – BCGCM1005B
|
Correspondence $240.00
Classroom on demand $240.00
|

|
Construction Estimation Course Overview
Owner Building Solutions Australia offer three additional or extension courses for those Owner Builders who wish to gain a greater knowledge and organisational skills relevant to managing and coordinating a small domestic construction project.
The units of competency are taken directly from the General Construction Training Package BCG03 and are tailored to meet the requirements of the Owner Builder.
This unit specifies the competency required to carry out measurements and perform simple calculations to determine task and material requirements for a job in a General Construction work environment.
A Statement of Attainment will be issued upon successful completion of this unit and can be credited towards Certificate II in General Construction.
Remember, greater knowledge means a more efficient project and greater potential to save your hard earned cash.
Plan and prepare
• Work instructions are confirmed and applied
• Safety requirements are obtained from the site safety plan, other regulatory specifications or legal obligations and applied
• Measuring and calculating equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults arerectified or reported
Obtain measurements
• Method of obtaining the measurement is selected and applied
• Measurements are obtained using a rule or tape, accurate to 1mm
• Measurements are confirmed and recorded
• Perform calculations
• Appropriate calculation method is selected for achieving the required result
• Material quantities for the project are correctly calculated using the appropriate factors
• Results are confirmed and recorded
Estimate approximate quantities
• Calculations for determining material requirements are taken
• Appropriate formulas for calculating quantities are selected
• Quantities are estimated from the calculations taken
• Material quantities for the project are calculated confirmed and recorded within enterprise tolerances |